INFO-TRAVAUX : Resumption of work on Georges, Evelina and Avenue d’Argenteuil streets
APRIL 1st, 2022

 

The Ville de Lachute’s Engineering Department informed you that Pronex Excavation Inc. will complete the rehabilitation work begun in the fall, starting April 4.

Location of upcoming work:

  • Rue Georges, between boulevard Tessier and rue Evelina;

  • Rue Evelina, between boulevard Tessier and rue Bédard;

  • Avenue d’Argenteuil, between civic numbers 233 and 241;

  • Avenue d’Argenteuil, at the intersection with boulevard Tessier.

The work involves replacing the sanitary sewer and water mains, installing a storm sewer and rebuilding the roadway and curbs.

The Ville de Lachute, in conjunction with the contractor, will do everything in its power to limit the negative impacts this work could have on the area’s residents and businesses.

The work will be completed in three (3) phases in 2022, between April 4 and June 21 and in one (1) phase in 2023 (dates are subject to change based on the progress of the work).

Phase 1 – April 4 – June 6, 2022
Rue Evelina between rue Georges and boulevard Tessier

  • Preparatory work;

  • Installation of temporary water supply;

  • Breaking of rock;

  • Sewer and water main rehabilitation;

  • Replacement of an aqueduct valve at the intersection of Georges and Bédard streets.


Phase 2 – April 11 – May 19, 2022
Avenue d’Argenteuil between rue Bédard and boulevard Tessier

  • Preparatory work;

  • Installation of temporary water supply;

  • Water diversion and sewer line connection between # 233 and # 241 Avenue d’Argenteuil.

Phase 3 – May 12 – June 23, 2022
Completion of rue George, rue Evelina and avenue d’Argenteuil

  • Installation of new curbs and 1st layer of paving;

  • Repair of private driveways;

  • Lawn repairs and landscaping.

Phase 4 – Summer-Fall 2023

  • Installation of the second layer of paving on rue Georges and rue Evelina.

Work schedule

  • Except for exceptions, work teams will be on site Monday to Friday from 7 am to 7 pm.

     

Traffic

  • Depending on the progress of the work, streets may be partially or completely closed to vehicular traffic.

  • At all times, pedestrian access to the buildings located near the construction site will be preserved. Driveways will generally be accessible, but may be hampered in some phases.

  • We ask you to respect the signs, the detour paths and to reduce your speed on the site.

     

Impacts of the work

  • Temporary Power Connection: Residents who are affected by major work on the water system will be connected to a temporary power system during the duration of the work. Affected residents will receive the contractor visit and documentation with additional explanations.

  • Water Outage: Affected residents and businesses will be notified by a notice 48-72 hours in advance in the event of a planned water outage.

  • Street Parking: Parking restrictions will be applied in and around the work area.

  • New curbs on rue Georges and rue Evelina: The introduction of new curbs on rue Georges and rue Evelina could lead to more significant adjustments to the grounds, including driveways, while making sure to keep acceptable terrain slopes towards the street.

  • Noise and dust: Possibility of noise and dust generated by the passage of trucks in the work area. Watering operations will be carried out when required.

  • Collection: The waste collection and recycling schedule will be maintained for the duration of the work. If required, the Contractor will move the bins to the side of the road at the beginning of the day and return them to their place at the end of the day. It is important to identify the bins (temporarily) in order to allow them to return to the residence or business. Unidentified bins will not be returned and will remain at the collection point near the site.

  • Heavy vehicle transport: In order to avoid problems in detour roads, it would be appreciated if heavy transport used other roads allowing this type of transport.

  • Landscaping: Residents are advised not to do landscaping in or near the municipal street right-of-way during the construction period. Since the work may impact slightly beyond the municipal right-of-way, it would be a pity to damage new plantations. Please be assured that surfaces that will be damaged as a result of the work will be repaired. However, if certain developments are located within the municipal right-of-way, they may not be able to be restored as a result of the work.

Citizens directly affected by this work will receive subsequent communications to inform them of the progress of the work.

 

The Ville de Lachute is aware of the inconvenience this work will cause and thanks you for your cooperation.

For information: Ville de Lachute Engineering Department : 450 562-3475

 



INFO-TRAVAUX : Replacement and rehabilitation of water mains
March 18th

 

The Ville de Lachute Engineering Department informed you that Bernard Sauvé Excavation Inc. will be replacing and rehabilitating the storm pipes between avenue Lorraine and the Walker Waterway.

 

The work involves the replacement of the back-lot storm pipes on grounds 421 and 423 of avenue d’Argenteuil and the back-lot outfall of 407 of avenue d’Argenteuil.

 

In addition, one-time rehabilitation without excavation of the storm pipe between 423 avenue d’Argenteuil and avenue Lorraine will take place. Excavation will not affect properties other than those mentioned above.

 

The Ville de Lachute, in collaboration with the contractor, will do everything in its power to limit the negative impacts that this work could cause to the residents of the area.

 

The work will be completed in two (2) phases.

 

The first phase will take place between March 23, 2022 and May 15, 2022.

The period of the second phase is not yet known.

(Dates are subject to change based on progress).

 

  • Phase 1 – March 23 to May 15, 2022

    – Engagement and Preparedness

    – Replacement of storm pipes between 423, avenue d’Argenteuil and outfall at 407, avenue d’Argenteuil

    – Punctual rehabilitation of the storm water main between the 423 lot of avenue d’Argenteuil and avenue Lorraine

    – Demobilization

     

  • Phase 2 – Upcoming Dates

    – Engagement and Preparedness

    – Piping

    – Replacement at Storm Outfall

    – Storm Outfall Redevelopment and Stacking

    – Demobilization

     

Work schedule

Except for exceptions, work teams will be on site Monday to Friday from 7 am to 7 pm.

 

Traffic

  • Depending on the progress of the work, some streets may be partially closed to vehicular traffic, but no full closures will be made;

  • At all times, pedestrian access to buildings adjacent to the construction site will be preserved. Driveways will generally be accessible;

  • We ask you to respect the signs, the detour paths and to reduce your speed on the site.

Impacts of the work

  • Possibility of noise and dust generated by the passage of trucks in the work area. Watering operations will be carried out when required.

The Ville de Lachute is aware of the inconvenience this work will cause and thanks you for your cooperation.

 